| RWE
Rheinbraun
Conveyor Transfer Design
The Rhenish (Rhineland) lignite-mining region covers
an area of some 2,500km² to the west of cologne
Germany. RWE Rheinbraun AG operates four large opencast
mines in the district - Hambach, Garzweiler, Inden and
Bergheim - which between them produced 94.3Mt of lignite
in 2001.
|
 |
|
|
Daw Mill
Once described as the most high-tech, long life face
ever brought into production in the UK, the 301's face
at Daw Mill colliery in Warwickshire is living up to
expectations. |
|
|
Soseggo
Sossego, which started shipping on June 3, is
the first CVRD copper project and the only greenfield
copper project in the world to start operating in 2004.
It is located in the south of the Carajas mineral province,
state of Para, Brazil. |
|
|
|
Atlanta
Hartfield Airport
In order to meet the increased demand for air travel
and reduce current delays, the city of Atlanta is building
a new 9,000 foot Fifth Runway. The runway is schedule
to be commissioned in May 2006. |
 |
|
| Escondida
Escondia, the world's largest copper mine, is in northern
Chile's Atacama Desert, 160 kms south-east of the port
city of Antofagasta, at 3,100 meters above sea level. |
|
|
Georgia
Power- Plant Scherer
Air Control Science®, Inc. (ACS) is an Engineer
Constructor of industry leading dust and fume control
systems. They deliver innovative, turnkey solutions
for complete material handling risk management. Their
approach is unique in that they are equipped with the
best methods and technologies available. |
|
|
| Wyodak |
|
|
Drummond
Drummond operates Colombia's second-largest coal mine,
in La Loma. In 2001, it marketed more than 12 million
metric tons of Colombian coal to more than a dozen countries. |
|
|
Belle
Ayr
RAG is considering a proposal for an overland conveyor
haulage system with the ultimate goal of
reducing overall coal haulage costs. The truck haul
distance between the pit and the train loadout has grown
over the years as mining has progressed to the west.
|
|
|
Cripple Creek
|
|
|
Freeport
|
|
|
Powder
River Coal - Rochelle Mine
Dust Control Inc (DCI) have developed and is marketing
a conveyor transfer system called “Passive Enclosure
Dust Control System” or PECS. PECS is a new concept
that utilizes existing
proven technologies to mitigate respirable and fugitive
dust at conveyor transfers. |
|
|
Baumgartner
Tunnel
As part of the Lower Meramec River System Improvement
project, the joint venture will use a Wirth TBM to bore
20,275 feet of 12-foot diameter tunnel. Three major
shafts and will be constructed, a lift station approximately
100 feet in diameter and 200 vertical feet, the termination
shaft will be 34 feet in diameter and the screen shaft
will be 36 feet in diameter. Site work began in mid-January
2004 with completion in 2006. |
|
|
Yucca
Mountain
On May 31, 1995 the Department of Energy (DOE) awarded
a contract to The Conveyor Company of Sibley, IA for
a muck handling system described as follows:
“Conveyor System will be 36” wide, approximately
25,900 feet long, maximum capacity of 1000 TPH, capable
of muck transport over an elevation gain of approximately
208 ft with three horizontal curves of approximately
115, 4 and 89 degrees, with one main drive unit and
four booster drive units.” |
 |
|
 |
 |
 |
 |
 |
|
|
| |